more info
Modular construction is significantly faster than stick building. Since modules are built in a controlled factory environment, the foundation construction and site work can proceed simultaneously on-site while modules are being fabricated at the manufacturing facility. This parallel processing reduces overall project timelines and minimizes delays caused by weather conditions and other site-related factors. This accelerated timeline can lead to quicker occupancy and reduced carrying costs for the project.